Project Highlights

Lorem Ipsum.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

1122 Mission Project

Development Resources & Logistics

The Mission Bell project, at the southeast corner of Mission Street and Fairview Avenue, calls for both ground-up construction and historic preservation. At completion, the proposed development would include 36 residential units, nearly 7,400 square feet of ground-floor retail space, and a two-level, 114-car basement parking garage to serve both tenants and patrons of Metro’s Gold Line. The project would replace two 1970s buildings with a two-to-three-story structure featuring Spanish Colonial Revival elements. The building would feature one- and two-bedroom dwellings, as well as amenities such as a gym and a private courtyard.

Atwater Village Project

Development Resources & Logistics

The Atwater Village project consists of six solar-powered modular constructed townhomes designed to meet LEED Platinum certification, these modern prefabricated townhomes are located in Atwater Village, one of Los Angeles’ most up-and-coming neighborhoods. A small lot subdivision subdivides a large lot into 6 small individual parcels. Each parcel has a 3-story home with livable space above the 1st floor. Each home has 3 bedrooms and 3 baths with several outdoor decks and a 2-car garage. This modular hybrid style of construction allows the garage and foundation to be built onsite while the modules with livable levels were prefabricated in the modular factory.

1600 Wilshire Project – “The Walter”

Co-Developer

A creation of Michael Maltzan Architecture, this 85-unit apartment building includes 4,500 sq. ft. of retail, along with amenities for residents, including a doorman, valet, concierge services, high-speed Wi-Fi, a rooftop deck with firepits, cabanas, pet washing stations, and a dog park.

330 E. Florence Project

Co-Developer

The 330 E. Florence Project is a 13-story mixed-use building on a 0.45-acre site in a highly urbanized part of Downtown Inglewood. The Project Site will deliver 155 residential units on a single parcel of land. The 330 E. Florence Project includes 9,300 square feet of open space and 7,700 square feet of ground-floor commercial space. The project site is accessible by regional and local transit, and the Project would provide bicycle and automated vehicle parking on-site.

Center for Nature Preservation & Youth Advancement

Owner Representative

The greenfield development of ninety-three (93) acres and the construction of a 20,000 square foot multipurpose assembly hall, dining hall, male & female dormitory facilities, 5,860 square foot proposed covered outdoor pavilion and amphitheater, guardhouse, 440-yard promenade/pedestrian path, botanical gardens, playground, 15,000 square foot vocational center, and eighty-five (85) space surface parking area.

Bellefontaine Assisted Living Community Project

Owner Representative

A mixed-used Assisted Living project with a ground floor commercial use proposes the development of the two combined parcels into an Assisted Living facility entailing approximately one hundred thirty (130) Residential/senior housing units, with communal areas and open space. The proposed unit mix consists of forty-two (42) Studios, sixty-four (64) 1-Bedroom, and twenty-four (24) 2-Bedroom units. The proposed ground floor commercial use is intended to provide preventative and rehabilitative care services and directly support the assisted living facility, in addition to the surrounding medical/hospital uses. The project size is estimated to be approximately 120,000 gross square feet, with 239 subterranean parking stalls and racked bike parking for 26 bicycles.

Vermont/Manchester Transit Priority Project

Design Development

Project address blight in the area on behalf of the Los Angeles County Supervisor, determining the constructability and financial feasibility analysis for the 5.13-acre site. Analysis yielded a project that consists of an innovative public charter boarding school serving 400 area youth and 180 units of affordable housing in addition to the transit plaza and vocational training center.

Inglewood Transit Connection Project

Real Estate Advisement

The Inglewood Transit Connector (ITC) Project entails transit improvements constructed in an area of the City of Inglewood within the public right-of-way from Market Street at the Metro Crenshaw/LAX Line to the Inglewood Forum, SoFi Stadium, and the Clippers Arena.

North Market Place

Real Estate Advisement

A 7.12-acre Transit- Oriented Development site with the Inglewood Transit Connector Project, on behalf of the City of Inglewood.

Lake on Wilshire

Owner Representative

An approximately 1,115,058 overall square foot development, which includes the construction of two (2) levels below grade with a ten (10) level parking podium/structure, a conversion of an existing building to a hotel, with a multicultural, learning, performing arts space; and a 478-unit residential apartment tower. Lake on Wilshire construction commences at the beginning of Q4- 2023.

Centro Westlake

Owner Representative

The proposed 1.3M square foot joint development project proposes the high-quality development of two towers (approximately 58 stories and 29 stories), 668 housing units (234 affordable housing units) 125,000 sf of commercial office space, 300 hotel rooms, and approximately 70,000 square feet of vibrant commercial uses.

Let's Book a Meeting!

Fill in the form and our team will get back to you as soon as possible.